Lineman

Hybrid-based
ONET: 49-9051.00

4

Years

76

Skills

580h

Related instructions

7980h

On-the-job training
Classroom instruction topics
  • Basic Electricity
  • Generation & Transmission of Electricity
  • Basic Math & Algebra
  • Nomenclature, Use of Tools and Equipment, Equipment Maintenance
  • Ropes, Knots & Splices
  • Conductors, Current Carrying Capacity
  • Construction & Maintenance of Distribution & Transmission Lines
  • Underground Systems
  • Series & Parallel Circuits
  • Inductance, Reactance, Alternating Current
  • Three Phase Systems
  • Transformer Connections (Wye & Delta)
  • Voltage Regulators; Capacitors
  • Substation Erection & Maintenance
  • Metering
  • Work Procedures - Transformers, Regulators, Reclosurers and Sectionalizers, OCB’s
  • Use of Voltmeters, Ampmeters
  • Protective Grounding
  • Troubleshooting
  • First Aid, CPR, Pole Top Rescue
  • Safety
  • Mapping and Locating and Traffic Control
On-the-job training
  • Pole Climbing
  • Poles/Framing Fixtures
  • Stringing and Sagging Conductors
  • Transformers
  • Services/Street Lighting
  • Underground Cable and Associated Equipment
  • Protective Equipment - Personal
  • Maintenance and Transformers
  • Substation Maintenance
  • Company Training
  • Competencies
    • Apply basic electricity and Ohms law
    • Wye and Delta configuration
    • Wire gauge and amperage
    • Series and parallel circuits
    • Generators and motors theory
    • Installing pole grounds and equipment grounds
    • Pole Framing on the ground
    • System troubleshooting
    • Theory of single, double and 3 phase
    • Basic Climbing Skills
    • Care & Inspection of Climbing Gear
    • Pole Inspection
    • Sharpening & Shaping of Climber Gaffs
    • Installation of guy assemblies
    • Safe working procedures installing cross arms
    • Proper use of perform tie wire
    • Demonstrate proper use of hot-line tools on energized lines
    • Demonstrate grounding techniques on trucks when using them in energized line situations
    • Pole Top Rescue
    • Aerial Pole Framing
    • Proper emergency procedures and bucket/basket rescue
    • Demonstrate safe pole setting practices
    • Demonstrate temporary pole supports
    • Perform grounding and safe work procedures
    • Perform a service wire installation
    • Perform temporary service installation
    • Perform building new construction
    • Perform dead ending and splicing
    • Safely string conductors in hot line re-conductoring
    • Perform use of proper tie wire for aluminum and copper conductor\
    • Make up jumpers on dead-end poles correctly
    • Operate reclosures and sectionalizes and properly install them on URD and overhead systems
    • Demonstrate proper use of cover-up material on energized lines
    • Demonstrate proper set-up of vehicle when preparing to work on energized electric lines
    • Demonstrate all safety aspects on installing and removing switches on a hot-line task
    • Demonstrate how to properly fuse switches so that the coordination of all equipment will work correctly
    • Demonstrate the proper use of lightning protection
    • Perform safe work practices in a substation
    • Demonstrate proper procedure of a substation inspection
    • Switching procedures
    • Over current devices
    • Voltage regulators
    • Internship
    • Safe Work Procedures & Responsibilities
    • Perform proper vehicle inspection and maintenance
    • Demonstrate inspection of mobile hydraulic system
    • Perform traffic control in a work area safely
    • Demonstrate operation of digger derrick vehicle
    • Demonstrate rigging and shoring a trench
    • Safe working operation of an aerial platform
    • Work site recognition and safe work practices
    • Perform proper vehicle placement and grounding methods
    • Apply cover-up materials in a safe manner
    • Perform proper rigging and setting of poles
    • Practice safe work practices and hazard recognition
    • Successfully read sag charts and tables
    • Use proper hoist and grips for conductor
    • Inspect rubber goods and hard-shell cover-ups
    • Demonstrate installation of a voltage regulator
    • Demonstrate substation grounding
    • Perform proper operation of a trencher
    • Perform safe trenching and excavating procedures
    • Perform safe work practices and protective grounding
    • Demonstrate troubleshooting and fault locating on an URD system
    • Demonstrate how to use and maintain equipment that is being used
    • Fusing applications for single phase and 3 phase applications
    • Proper grounding application for single phase and 3 phase applications
    • Proper sizing of transformer on single phase and 3 phase applications
    • Internal working parts of a pole mount and pad mount transformers
    • Demonstrate single phase transformer connections
    • Demonstrate 3 phase transformer connections
    • Demonstrate proper equipment grounding
    • Proper transformer protection and sizing applications
    • Proper placement of transformers on pole and underground
    • Teamwork
    • Insulation installation
State:
Headquarters location:
Winfield, KS (67156)
calendar.svg
Get on our calendar
Not sure if WorkHands is right for you? Chat with our team today
sendEmail.svg
Send us an email
We'll get back to you shortly